[Dec-2021 Newly Released] AACE-PSP Exam Questions For You To Pass [Q53-Q71]

Share

[Dec-2021 Newly Released] AACE-PSP Exam Questions For You To Pass

AACE International AACE-PSP Exam: Basic Questions With Answers 


What is the duration, language, and format of the Planning & Scheduling Professional (PSP) Exam

  • Passing score: 70%
  • Total questions: 119
  • Language of Exam: English
  • Format: Multiple choice, compound, scenario questions + 1 memo writing assignment
  • Duration of Exam: 5 hours

How to book the Planning & Scheduling Professional (PSP) Exam

Follow the steps mentioned below to book the Planning & Scheduling Professional (PSP) Exam:

  • Step 1: Visit the AACE’s website by clicking here
  • Step 2: Create a new account or log in to an existing account
  • Step 3: Select your professional exam
  • Step 4: Complete the required course and take PSP practice test
  • Step 5: Fill the application and submit all required documents
  • Step 6: Schedule your exam by following the instructions on the website

For more info read reference:

Official Website

Exam Contents

FAQs and Guide

 

NEW QUESTION 53
Is activity 7001 pictured correctly in the precedence diagram?

  • A. No, the start-to-start and finish-to-finish relationships are backwards.
  • B. Yes, the duration is 48 days.
  • C. No, the total float is not shown correctly.
  • D. Yes, except the early finish date is not shown.

Answer: B

 

NEW QUESTION 54
The expected remaining cost needed to complete an activity, group of activities or the project is the____________.

  • A. Estimate to complete (ETC)
  • B. Estimate at completion (EAC)
  • C. Budget at completion (BAC)
  • D. Budgeted cost of work performed (BCWP)

Answer: A

 

NEW QUESTION 55
What is the cycle time?

  • A. 14 minutes
  • B. 5 minutes
  • C. 6 minutes
  • D. 17 minutes

Answer: D

 

NEW QUESTION 56
What is the primary difference between the arrow diagramming method (ADM) and the precedence diagramming method (PDM)?

  • A. ADM is limited to finish-to-start logic relationships, while PDM is not.
  • B. PDM is a bar chart with network logic, while ADM is a pure logic network.
  • C. ADM uses arrows, while PDM uses boxes.
  • D. ADM is manual CPM calculations, while PDM is computerized.

Answer: A

 

NEW QUESTION 57
An early start constraint dictates

  • A. The planned start of a successor activity
  • B. The planned start of an activity.
  • C. An activity's remaining duration.
  • D. The actual start of an activity.

Answer: A

 

NEW QUESTION 58
The work breakdown structure is used to organize

  • A. Similar activity coding of schedule activities
  • B. The chart of accounts
  • C. "Smart activity ID codes" representing similar items of scheduled work
  • D. The smallest defined work packet

Answer: D

 

NEW QUESTION 59
The linear scheduling velocity diagram has the following two-axis:

  • A. Time and rate of progress
  • B. Time and location
  • C. Location and crew size
  • D. Time and crew size

Answer: A

 

NEW QUESTION 60
Assuming that you had only one crane capable of 30 lifts per day, 3 column pours requiring 28 lifts each, plus associated assorted work requiring an additional 150 lifts, what is the minimum planned working duration for this work?

  • A. 8 work days
  • B. 7 work days
  • C. 18 work days
  • D. 15 workdays

Answer: A

 

NEW QUESTION 61
At a minimum, periodic reporting must be done at what interval?

  • A. Monthly.
  • B. As requested by the project manager.
  • C. As requested by the owner.
  • D. As specified in the contract documents.

Answer: D

 

NEW QUESTION 62
Which activity is drawn in the incorrect position?

  • A. Activity C.
  • B. Activity D.
  • C. Activity G.
  • D. Activity E.

Answer: B

 

NEW QUESTION 63
How much Total Float does drafting the product manual have?

  • A. 10 workdays.
  • B. 15 workdays.
  • C. 0 workdays.
  • D. 5 workdays.

Answer: A

 

NEW QUESTION 64
Time-scaled logic diagrams are

  • A. Logic networks that are drawn to match the calendar.
  • B. Only calculated using a computer.
  • C. The same as a pure-logic diagram.
  • D. Used to calculate the most probable activity duration.

Answer: A

 

NEW QUESTION 65
What does the narrow band at "Y" represent?

  • A. A rework period.
  • B. You cannot tell with the information supplied.
  • C. Resource limitation period.
  • D. Activity inactivity.

Answer: D

 

NEW QUESTION 66
Which of the following is NOT required when initially planning a project?

  • A. Logical relationships between the tasks.
  • B. A schedule that identifies tasks required on a project.
  • C. Resource Identification and leveling.
  • D. The duration of each task.

Answer: D

 

NEW QUESTION 67
There is only enough room for a maximum of 4 cranes to be placed on-site. Assuming that a single crane can perform 35 lifts per day and that a column pour requires 60 lifts, what is the minimum number of tower cranes that should be used for the above described column pours?

  • A. 2 cranes
  • B. 3 cranes
  • C. 4 cranes
  • D. 1 crane

Answer: A

 

NEW QUESTION 68
In order for a claimant to be entitled to an extension of contract time for a delay event (and further to be considered compensable):

  • A. The delay must affect the contractor's planned construction schedule.
  • B. The delay must not cause monetary harm to the defendant.
  • C. The delay must affect the critical path.
  • D. The delay must be concurrent with the delay attributable to both parties.

Answer: C

 

NEW QUESTION 69
Budgeted cost of work scheduled is _______________________.

  • A. The value of the completed work expressed in terms of the budget assigned to that work
  • B. The total authorized budget for accomplishing the project scope
  • C. The sum of all budgets for work scheduled to be accomplished within a given time period
  • D. The expected total cost of an activity, group of activities or the project

Answer: D

 

NEW QUESTION 70
How could the structural steel drawing delay have been prevented?

  • A. Release the structural steel for fabrication concurrent with review of structural steel shop drawings.
  • B. Allow adequate time for review and resubmittal in the baseline schedule.
  • C. Switch to post-tensioned concrete construction.
  • D. Add a time buffer at the end of structural steel activities.

Answer: D

 

NEW QUESTION 71
......