NEW QUESTION 17
You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.

  • A. Select the Automatically Transact check box while defining the Standard Operation.
  • B. Deselect the Count Point check box while defining the Standard Operation.
  • C. Select the Count Point check box while defining the Standard Operation.
  • D. Ensure that the Charge Type of the resource is Automatic.

Answer: C

 

NEW QUESTION 18
In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting in frozen type.

  • A. Publish cost planning scenario to Accounting.
  • B. Transfer Transactions from Inventory to Costing.
  • C. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition.
  • D. Create Accounting Distributions.
  • E. Transfer transactions from production to Costing.
  • F. Build cost planning scenario and perform cost roll up.

Answer: B,C,D

 

NEW QUESTION 19
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

  • A. Create accounting
  • B. Transfer Transactions from Production to Costing
  • C. Transfer Transactions from Inventory to Costing
  • D. Transfer Costs to Cost Management

Answer: B

 

NEW QUESTION 20
A Production operator in your company is required to report production activities, such as completing or scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.

  • A. Material Transactions
  • B. Resource Transactions
  • C. Orderless Transactions
  • D. Operation Transactions
  • E. Movement request

Answer: C

 

NEW QUESTION 21
Which entity should you use to configure the manufacturing plant in Functional Manager?

  • A. Organization
  • B. Plant
  • C. Legal Entity
  • D. Business Unit

Answer: B

 

NEW QUESTION 22
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.

  • A. Oracle Business Intelligence Application
  • B. Oracle Business Intelligence Standard Edition
  • C. Oracle Business Intelligence Enterprise Edition
  • D. Oracle Business Intelligence Publisher

Answer: D

 

NEW QUESTION 23
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and the corresponding HTTP action available with Manufacturing Cloud.

  • A. Work Order Status GET method
  • B. Work Order Status POST method
  • C. Resource transaction POST method
  • D. Resource transaction GET method
  • E. Work Orders PATCH method
  • F. Work Orders GET method

Answer: A,C,E,F

 

NEW QUESTION 24
In your customer's manufacturing facility, different types of Movement Requests are created. Key manufacturing components are issued to the work orders form the manufacturing subinventory. The manufacturing subinventory receives its supplies form the Warehouse subinventory through automatically created Movement Requests.
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory?

  • A. Requisition Movement Requests
  • B. Pick Wave Movement Requests
  • C. Batch Wave Movement Requests
  • D. Replenishment Requests

Answer: A

 

NEW QUESTION 25
A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.

  • A. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP
  • B. Define Local sourcing rule for organization MP: Source Type Make At, Source MP
  • C. Define Local sourcing rule for organization DW: Source Type Make From, Source MP
  • D. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW

Answer: A,B

 

NEW QUESTION 26
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.

  • A. Production Priority
  • B. Delete an Operation
  • C. Add an Operation
  • D. Completion Subinventory
  • E. Costing Priority

Answer: A,C,D

 

NEW QUESTION 27
As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

  • A. The Manage Items Profile Options tasks
  • B. The Supply Chain Orchestration Functional Area
  • C. The Manufacturing Master Data Functional Area
  • D. The Manage product and Child Value Sets task

Answer: C

 

NEW QUESTION 28
In a manufacturing cloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.

  • A. Report Receipts
  • B. Report Material Transactions by Quantity and Serial Number
  • C. Report Cost Transactions
  • D. Report Resource Transactions
  • E. Report Component Returns

Answer: B,D

 

NEW QUESTION 29
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.

  • A. Rescheduled Work Order WO-2045 duration = 1.25 days
  • B. Rescheduled Work Order WO-2045 duration = 3.25days
  • C. Rescheduled Work Order WO-2045 duration = 0.75 days
  • D. Rescheduled Work Order WO-2045 duration = 2 days

Answer: C

 

NEW QUESTION 30
Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the Morning Shift and the remaining units are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?

  • A. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
  • B. Select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the resource LATHE in the Morning Shift column.
  • C. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 40% against the resource LATHE in the Evening Shift column.
  • D. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.
  • E. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 60% against the resource LATHE in the Morning Shift column.
  • F. Select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the resource LATHE in the Evening Shift column.

Answer: B,E

 

NEW QUESTION 31
Your customer has the following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goods as one of its component.
Identify the way to establish the relationship between Pallet and Engine Work Definitions.

  • A. Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for Engine.
  • B. The two Work Definitions can be tied through Project or Seiban numbers.
  • C. The Work Definition versions can be used to tie the Work Orders.
  • D. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work Definition for Pallet.

Answer: C

 

NEW QUESTION 32
You are reviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

  • A. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
  • B. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
  • C. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.
  • D. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.

Answer: D

 

NEW QUESTION 33
One of the key execution capabilities that Oracle Manufacturing Cloud offers is that you can generate and manage work order exceptions.
Which option shows the production exception types that can be reported by the production operator?

  • A. Work Center and Resources
  • B. Work Area, Work Center, and Resources
  • C. Resources and Components
  • D. Work Area, Work Center, Resources, Components, and Miscellaneous
  • E. Work Area, Work Center, Resources, and Components

Answer: C

 

NEW QUESTION 34
In a manufacturing plant, a production operator in a given shift completes a car assembly and reports this using orderless completion by referencing a Work Definition.
Identify the two purposes of the referenced Work Definition in Orderless reporting.

  • A. Scrap material
  • B. Return material
  • C. Resource usage
  • D. Material usage
  • E. Processing steps

Answer: C,D

 

NEW QUESTION 35
Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?

  • A. Select a resource that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
  • B. Ensure there is only one default standard operation at a given point in time.
  • C. Ensure the predefined work definition name ORA_MAIN name is active.
  • D. Ensure the item is a standard item with a secondary item structure.
  • E. Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.

Answer: C,D,E

 

NEW QUESTION 36
......

Oracle Manufacturing Cloud 2020 Implementation Essentials Certification Sample Questions and Practice Exam: https://www.exams4sures.com/Oracle/1z0-1075-20-practice-exam-dumps.html