[Oct-2021] Pass MB-320 Exam in First Attempt UpdatedMB-320 Exams4sures Exam Question
Microsoft Dynamics 365 Dumps MB-320 Exam for Full Questions - Exam Study Guide
NEW QUESTION 21
You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item.
The item has the following Lean setup:
* The setup uses a Lean schedule group with a throughput ratio=2
* The process activity tied to production flow has the following runtime activity times: time=3 min, per quantity=1
* The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8-hour day)
* The throughput is 10 per hour
You need to set up a Discrete operation to mirror the item's production flow activity.
What should you do?
- A. Create a route with a runtime =1, a process quantity =10, and the operation's hours/time =1
- B. Create a route with a runtime =6, a process quantity =1, and the operation's hours/time =1
- C. Create a route with a runtime =1, a process quantity =6, and the operation's hours/time =1
- D. Create a route with a runtime =10, a process quantity =6, and the operation's hours/time =1
Answer: A
NEW QUESTION 22
A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You have created the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You create separate subcontracting purchase orders to account for the service. You attempt to add the service item to the BOM. The system generates an error.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
1 - Create a new item model group and clear the stocked product option.
2 - Assign the item model group and select the stocked product option.
3 - Add the service item to the BOM.
NEW QUESTION 23
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company. It is the end of the year and the labor rates have been recalculated based on new salary data. You need to update the effective labor costs for all labor groups.
Which element must be updated?
- A. cost category
- B. shared category
- C. cost groups
- D. production orders
- E. resource group
Answer: D
NEW QUESTION 24
You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:
You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Review the calendar for the resource to determine if it is expired.
- B. Review the available resources for Operation 10. Navigate to the Resource form and validate whether there is a calendar assigned.
- C. Review the resource group assigned to Operation 10. Check to see if there is a calendar assigned and if the calendar is expired.
- D. Navigate to the work calendar and view working times. Validate that there are working days created in the scheduled period.
Answer: A,B
Explanation:
Explanation/Reference:
NEW QUESTION 25
You are responsible for product and formula maintenance for a paint manufacturer.
You create a formula for white paint and add its lines. When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately.
You need to set up the formula line for the pigment.
Which formula feature should you use?
- A. Pegged supply
- B. Step consumption
- C. Variable
- D. Scalable
Answer: D
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/formulas-vers
NEW QUESTION 26
A company wants to account for the time to set up a machine to manufacture a new part.
You need to set up the costing calculations in the system.
Which three calculation group warnings can you set up? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. No cost price
- B. No consumption
- C. No route
- D. No BOM
- E. No resources
Answer: A,C,D
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/cost-management/bom-calculation-groups
NEW QUESTION 27
A company implements Dynamics 365 for Finance and Operations.
You run a master plan each week.
You need to resolve the issue in the scenario.
What should you do? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/job-scheduling
NEW QUESTION 28
You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company.
You must build a new configuration model and include constraints in the model.
You need to determine which constraint type to use for each scenario.
Which constraint type should you use? To answer, drag the appropriate constraint types to the correct scenarios. Each constraint type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 29
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 30
You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters.
A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level.
You need to configure the Manufacturing execution production order defaults form to allow for back flushing on operations.
How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/production-pa
NEW QUESTION 31
A customer produces light projection toys for holiday decorations throughout the year. The production process creates the projections toy at the following work cells stands, main assembly, electric, visuals, and packaging.
You need to configure the subcontracted transfer activity.
What should you do?
- A. Set the transfer Freighted by value to Shipper. Ensure that purchase agreements include the vendor ID of the vendor.
- B. Set the transfer activity Freighted by value to Carrier. Ensure that purchase agreements include the vendor ID of the warehouse.
- C. Set the transfer activity Freighted by value to Recipient. Ensure that purchase agreements include the
- D. Set the transfer Freighted by value to Carrier. Ensure that purchase agreements include the vendor ID of the vendor.
- E. Set the transfer activity Freighted by value to Shipper. Ensure that purchase agreements include the
- F. Set the transfer activity Freighted by value to Recipient. Ensure that purchase agreements include the
Answer: F
Explanation:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/activity-based-subcontracting#subcontracted-transfer-activities
NEW QUESTION 32
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses batch tracking of raw materials, semi-finished goods, and finished goods.
It is difficult to determine when semi-finished and finished goods were produced and expired.
You need to incorporate automatic batch expiration dates for tracked items that are produced.
Solution:
1. Assign shelf life period in days to the items that require expiration dates.
2. Create a new batch number in the tracking dimensions for the items.
3. Enter the manufacturing date.
4. Save the record.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: B
NEW QUESTION 33
A process manufacturing company is implementing Dynamics 365 for Finance and Operations. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 34
A manufacturer uses discreet orders and manually consumes material after reporting products as finished.
You are performing an end-of-month closing for remaining picking lists on production orders. You must not be required to consume the full amount of material on production order picking lists as a result of improved production efficiency. When the production manager verifies that no material is left to consume, there are remaining back-ordered amounts.
You need to pick the line item short and eliminate the remaining demand.
What should you do?
- A. Enter the consumption amount on the line to match the actual amount used, and delete the remaining amount.
- B. Change the Coverage group on item option to manual.
- C. Delete the item from the Bill of materials for the finished good.
- D. Enter the consumption amount on the line to match the actual amount used and select end on the production order picking list.
Answer: D
NEW QUESTION 35
You are the product manager at an orange juice manufacturing company.
For every 1,000 pounds of orange juice, 20 pounds of orange pulp is created which can be sold or reused profitably. The cost is calculated as a weighted average between the quantity of orange juice that is reported as finished and the orange pulp based on the standard cost of each item.
You need to create the formula for orange juice that will produce orange pulp as a result of finishing a batch order.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 36
You have a product that can be manufactured on two different production lines in the same warehouse.
You create resources and then create individual input locations for the resources. You create two routes.
Each route uses different resources.
Materials are staged for consumption in different locations based on the resources being utilized for production.
You need to set up the formula to consume the goods from the correct line-side location.
What should you do?
- A. Select a warehouse and consumption operation for each line.
- B. Select resource consumption and the operation for each line.
- C. Select the plan group and consumption operation for each line.
- D. Specify a site in the formula header.
Answer: B
NEW QUESTION 37
A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 38
You have updated a cost category price from $5.00 to S7.00. You process a production order which uses the cost category. After ending the order, you realize a new standard cost was not calculated after the price update. You need to validate how this impacted the financial voucher transactions. What transaction would you see in the general ledger?
- A. $2.00 debit to the production quantity variance account
- B. $2.00 debit to the production price variance account
- C. $2.00 credit to the production price variance account
- D. $2.00 credit to the lot size variance account
Answer: B
NEW QUESTION 39
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.
Answer:
Explanation:
NEW QUESTION 40
You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 41
A manufacturing company uses advanced warehouse management functionality for a new warehouse.
After releasing a production order, you observe that the warehouse work for raw material picking was not generated.
You need to go through the warehouse management setup to determine what is missing.
What three setup configurations must you validate? Each correct answer presents part of the solution.
NOTE; Each correct selection is worth one point.
- A. Work template for raw material picking.
- B. Wave template.
- C. Confirm the production output location on your resource group.
- D. Location directive for raw material picking.
- E. Directive codes.
Answer: A,B,D
NEW QUESTION 42
A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.
The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource.
You need to create a cost category for the new resource.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 43
......
Authentic Best resources for MB-320 Online Practice Exam: https://www.exams4sures.com/Microsoft/MB-320-practice-exam-dumps.html
Get the superior quality MB-320 Dumps with explanations waiting just for you, get it now: https://drive.google.com/open?id=1DlB8ay1PKEBhrwUMxWaebAy_3-PCuil_