NEW QUESTION 37
Your customer plans a plant shutdown and wants to use the Maintenance Event Builder to plan revisions and create maintenance orders automatically.
What must you do in Customizing?
- A. Create a revision type and select Not WPS-Controlled.
- B. Define field values for PM/PS Reference Element
- C. Create a revision type and select WPS-Controlled.
- D. Define transfer of project or investment program
Answer: C
NEW QUESTION 38
Which of the following are prerequisites for business completion? (Choose two)
- A. The order must be fully settled.
- B. The order must have planned costs.
- C. The order must have actual costs.
- D. The balance of the order must be zero.
Answer: A,D
NEW QUESTION 39
The view profile enables you to create a customized selection of tabs for use with technical objects.
Which Customizing step(s) must you perform to make a view profile available?
- A. Activate customized tabs for each equipment category or functional location category.
- B. Create the view profile and assign it to an object type.
- C. Create the view profile for a particular screen group and then assign it to a functional location category or equipment category.
- D. Create the view profile in the master record of either equipment or functional location.
Answer: C
NEW QUESTION 40
You use the F4 key to...
Choose the correct answer(s).
Response:
- A. Call the SAP Library
- B. Obtain technical details for a program
- C. Show possible input values for an entry field
- D. Start another session
- E. Generate an output request for the current screen
Answer: C
NEW QUESTION 41
A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?
- A. Create a new technical object to represent the new measuring point.
- B. Create a special measuring document and set the Counter Replacement indicator.
- C. Create a new measuring point and change the measuring point from which the measurement reading was transferred.
- D. Dismantle the old measuring point and create a new measuring point.
Answer: B
NEW QUESTION 42
What do you use to set up a refurbishment order for external refurbishment?
Please choose the correct answer.
Response:
- A. An order type for external refurbishment and an assignment of a material with split valuation.
- B. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.
- C. An external operation that contains a control key for refurbishment.
- D. An order type for external refurbishment and a material item with item category External
Refurbishment.
Answer: B
NEW QUESTION 43
Which of the following steps must you perform to customize priorities for a maintenance order?
Please choose the correct answer.
Response:
- A. Assign a priority type to an order type.
- B. Assign a priority type to a technical object master record.
- C. Assign priorities to technical object master records.
- D. Assign priorities to order types.
Answer: A
NEW QUESTION 44
Refer to the Exhibit.
You are testing failover from a host perspective. The host has been configured in a "Failover Only MPIO" configuration. When running IOmeter if the Data Path 2 cable from the host is disconnected, will the host survive the failover?
- A. Yes; Failover MPIO should failover
- B. No; Failover MPIO is configured for only Data Path 1
- C. Yes; the server has Data Path 1 connected to both controllers
- D. No; IOmeter is sending I/O only on one path
Answer: A
NEW QUESTION 45
When is the latest possible point in time that you can create a settlement rule?
- A. After order release
- B. Before technical completion
- C. After technical completion
- D. Before order release
Answer: B
NEW QUESTION 46
Which of the following combinations must you use to create a single-cycle maintenance plan for an external service?
Please choose the correct answer.
Response:
- A. A framework order and a maintenance order for settlement
- B. A framework order and a subcontract purchase order
- C. A maintenance order for settlement and an outline agreement
- D. A subcontract purchase order and an outline agreement
Answer: A
NEW QUESTION 47
A customer is concerned they are over utilizing their 7K drives. Where can information about the real time I/O usage of individual drives be viewed?
- A. Hardware > Disks > [disk folder]
- B. Charting > Disks > [disk folder] IO Charts
- C. Charting > Disks > [disk folder] > [disk number]
- D. Hardware > Disks > [disk folder] > [disk number]
Answer: D
NEW QUESTION 48
Name the data which is created during the monitoring, controlling, regulation and optimization of a technical process.
Please choose the correct answer.
Response:
- A. Document entry
- B. Measurement system
- C. Process control system
- D. WAMP
Answer: C
NEW QUESTION 49
An administrator wants to configure an SC Series array to use Virtual Port Mode. What is a requirement to accomplish this task?
- A. NPIV must be disabled on Fibre Channel switches
- B. I/O Controller cards must use a single-ID firmware version
- C. Activation license must be purchased and installed
- D. Fibre Channel switches must use a switched fabric topology
Answer: C
NEW QUESTION 50
In an SC Series environment, which Fibre Channel zoning method is more flexible?
- A. Single Initiator/Multi-Target
- B. Port
- C. WWN
- D. Single Initiator/Single Target
Answer: C
NEW QUESTION 51
Which task list can have both external and internal number assignment for the task list group number?
Please choose the correct answer.
Response:
- A. Functional location task list
- B. General task list
- C. Bill of material task list
- D. Equipment task list
Answer: B
NEW QUESTION 52
What does the structure indicator for a functional location determine? (Choose three)
- A. The functional location type
- B. The number of characters for each hierarchy level
- C. The number of hierarchy levels for a particular structure
- D. The functional location category
- E. The edit mask
Answer: B,C,E
NEW QUESTION 53
What is the maximum number of disks that can be supported by an SC4020 running SCOS 6.6.4 or later?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: A
NEW QUESTION 54
Your customer has several plants. How do you set up the maintenance organizational structure to implement centralized maintenance planning?
Please choose the correct answer.
Response:
- A. Assign all your work centers to one of your central planning plants.
- B. Define a planning plant and assign the maintenance plants to this planning plant in Customizing.
- C. Assign all your work centers to one of your maintenance plants.
- D. Define a plant and assign it to a company code.
Answer: B
NEW QUESTION 55
Under which conditions you can change stock information in the serial number manually.
There are 2 correct answers to this question.
Response:
- A. Sterilization operation
- B. No plant has been entered
- C. BOM active
- D. No stock check is active
- E. All active
Answer: B,D
NEW QUESTION 56
Which of the following components is included in SAP Solution Manager?
- A. SAP NetWeaver Enterprise Search
- B. SAP NetWeaver Business Warehouse
- C. Master data management
- D. Service Desk
Answer: D
NEW QUESTION 57
How are the planned costs for the refurbished part or parts displayed in the planned/actual order report?
- A. As costs with a negative value
- B. As costs with a positive value
- C. As revenue with a positive value
- D. As revenue with a negative value
Answer: A
NEW QUESTION 58
In order costing configuration, for what is the allocation structure used?
- A. To determine the cost elements that are allowed in the plant maintenance order
- B. To determine the settlement receiving elements for costs debited to the order
- C. To provide a method of consolidating costs in the Plant Maintenance Information System
- D. To allocate costs to a hierarchy of maintenance technical objects
Answer: B
NEW QUESTION 59
When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type?
- A. Maintenance planner group
- B. Maintenance activity type
- C. Priority
- D. Main work center
Answer: A
NEW QUESTION 60
What are the prerequisites for installing equipment at a functional location? (Choose two)
- A. The functional location master record allows the installation.
- B. A cost center is assigned to the equipment.
- C. A fixed asset is assigned to the equipment.
- D. The equipment category of the equipment allows the installation.
Answer: A,D
NEW QUESTION 61
......
SAP C_TPLM30_67 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
C_TPLM30_67 Exam Certification Details:
| Languages: | German, English |
| Duration: | 180 mins |
| Level: | Associate |
| Cut Score: | 51% |
| Sample Questions: | SAP C_TPLM30_67 Exam Sample Question |
| Exam: | 80 questions |
Pass Your SAP Exam with C_TPLM30_67 Exam Dumps: https://www.exams4sures.com/SAP/C_TPLM30_67-practice-exam-dumps.html