C_TPLM30_67 Free Certification Exam Material from Exams4sures with 97 Questions [Q18-Q33]

Share

C_TPLM30_67 Free Certification Exam Material from Exams4sures with 97 Questions

Use Real C_TPLM30_67 - 100% Cover Real Exam Questions 

NEW QUESTION 18
A customer wants to add an iSCSI path to a Microsoft Windows Server 2012 R1. The server has an existing Fibre Channel path to an SC7020 array for load balancing and high availability.
Which Windows MPIO policy should be configured to achieve the customer's requirement?

  • A. Round Robin
  • B. Round Robin with Subset
  • C. Weighted Paths
  • D. Fail Over Only

Answer: A

Explanation:
Explanation/Reference: https://www.google.com/url?
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=2ahUKEwig4LmO8KHcAhWDORQKHWpC CRQQFjAAegQIAxAC&url=http%3A%2F%2Fen.community.dell.com%2Fcfs-file%2F__key%2Ftelligent- evolution-components-attachments%2F13-4491-00-00-20-43-93-10%
2FSC_2D00_Series_2D00_Synchronous_2D00_Replication_2D00_and_2D00_Live_2D00_Volume_2D00_Dell
_2D00_EMC_2D00_2017_2D002800_CML1064_2900_.pdf%3Fforcedownload%
3Dtrue&usg=AOvVaw2U039ZfRgHPhpM3KkHmN4z

 

NEW QUESTION 19
Which of the following always produces up-to-the-minute costing information for maintenance orders?
Please choose the correct answer.
Response:

  • A. A standard query in SAP Net Weaver Business Warehouse
  • B. A standard analysis from the Plant Maintenance Information System (PMIS)
  • C. A shift report based on shift notes
  • D. A maintenance order list

Answer: D

 

NEW QUESTION 20
Which of the following information can the shift report display?
There are 3 correct answers to this question.
Response:

  • A. Planned and actual costs for shifts
  • B. Measurement documents and goods movements
  • C. Maintenance orders and notifications
  • D. Digital signatures for approval of a shift report
  • E. Maintenance plans and task lists

Answer: B,C,D

 

NEW QUESTION 21
When a user creates a notification or an order and enters a functional location as the reference object, you want the system to suggest the subordinate equipment automatically.
In addition to setting the reference object view in the order or the notification, what other settings must you make? (Choose two)

  • A. Set the Single Installation indicator in the equipment master data record.
  • B. Set the Equipment-Installation Allowed indicator in the Functional Location master data record.
  • C. Set View Profiles for Technical Objects in Customizing.
  • D. Set the Single Installation indicator in the Functional Location master data record.

Answer: B,D

 

NEW QUESTION 22
When performing the initial configuration on an SC9000 through the serial port, which command is used to reboot the controller?

  • A. qle factoryreset 5 0
  • B. -restart
  • C. -reset
  • D. cs purge all

Answer: A

 

NEW QUESTION 23
Which command is used to set the eth0 IP address on an SC4020 controller?

  • A. ifconfig inet eth0 [IP address] [netmask] [gateway]
  • B. controller ipconfig eth0 [IP address] [netmask] [gateway]
  • C. ifconfig inet eth0 [IP address/prefix length]
  • D. controller ipconfig eth0 [IP address/prefix length]

Answer: C

Explanation:
Explanation/Reference: https://www.dell.com/community/Compellent/Dell-SC4020/td-p/5036791

 

NEW QUESTION 24
Your customer wants to establish a maintenance work center with various activity types, each with a different fixed price.
How do you accomplish this?

  • A. Create various maintenance activity types in each work center and assign a price.
  • B. Create various maintenance activity types with the fixed prices and assign them to the work center.
  • C. Define the activity types for each maintenance planning plant.
  • D. Define the activity types in Controlling and assign them to the cost center of the work center.

Answer: D

Explanation:
Explanation/Reference:

 

NEW QUESTION 25
Which of the following information can the shift report display? (Choose three)

  • A. Planned and actual costs for shifts
  • B. Measurement documents and goods movements
  • C. Maintenance orders and notifications
  • D. Digital signatures for approval of a shift report
  • E. Maintenance plans and task lists

Answer: B,C,D

 

NEW QUESTION 26
What is the info cube dimensions?

  • A. Maintenance
  • B. Message reader
  • C. Functional location/equipment
  • D. Project analysis
  • E. Controller

Answer: C

 

NEW QUESTION 27
What are the prerequisites for order settlement? (Choose three)

  • A. The order must be released.
  • B. The order has not been settled previously.
  • C. The order must be technically completed.
  • D. The settlement profile used in the order type must allow settlement.
  • E. A settlement rule must be created for the order.

Answer: A,D,E

 

NEW QUESTION 28
When is the latest possible point in time that you can create a settlement rule?

  • A. Before order release
  • B. After technical completion
  • C. Before technical completion
  • D. After order release

Answer: C

 

NEW QUESTION 29
Based on SAS back-end cabling best practices, which configuration represents how an SC4020 storage array with one SC220 expansion enclosure is cabled?

  • A.
  • B.
  • C.
  • D.

Answer: A

 

NEW QUESTION 30
Your customer wants to assign maintenance orders to network activities automatically with the Maintenance Event Builder (MEB). Which of the following steps must you perform? (Choose two.)

  • A. Set the Define Transfer of Project or Invest Program indicator.
  • B. Assign a network to a revision with revision type WPS-controlled.
  • C. Assign a hierarchical task list to a notification.
  • D. Assign maintenance orders manually to a revision with revision type WPS-controlled.
  • E. Assign the Reference PM/PS element to task list headers and network activities.

Answer: B,E

 

NEW QUESTION 31
Users need to be able to select operations and work centers from the task list when they create a maintenance order with task list selection.
In Customizing, how can you accomplish this requirement? (Choose two)

  • A. By setting the indicators for the planning plant only
  • B. By activating the operation selection indicator
  • C. By setting the indicators for the order type only
  • D. By activating the work center selection indicator

Answer: B,D

 

NEW QUESTION 32
A customer is concerned they are over utilizing their 7K drives. Where can information about the real time I/O usage of individual drives be viewed?

  • A. Charting > Disks > [disk folder] > [disk number]
  • B. Charting > Disks > [disk folder] IO Charts
  • C. Hardware > Disks > [disk folder]
  • D. Hardware > Disks > [disk folder] > [disk number]

Answer: D

 

NEW QUESTION 33
......

Dumps Brief Outline Of The C_TPLM30_67 Exam: https://www.exams4sures.com/SAP/C_TPLM30_67-practice-exam-dumps.html